Skip to content

add merged frc comp in dptest plot #75

add merged frc comp in dptest plot

add merged frc comp in dptest plot #75

Triggered via push December 14, 2024 17:33
Status Failure
Total duration 1m 18s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build (3.8)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.
build (3.8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636