Skip to content

master

master #308

Triggered via schedule December 22, 2024 01:45
Status Failure
Total duration 2m 5s
Artifacts

master.yaml

on: schedule
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
Test (1.60.0)
Process completed with exit code 101.
Test (stable)
The job was canceled because "_1_60_0" failed.
Test (stable)
The operation was canceled.
Test (1.60.0)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636