Skip to content

Go

Go #5945

Triggered via schedule November 8, 2023 23:04
Status Failure
Total duration 1h 21m 30s
Artifacts 5

go.yaml

on: schedule
Verify
3m 55s
Verify
Verify dependencies
24s
Verify dependencies
Build and test
8m 7s
Build and test
Build Helm charts
21s
Build Helm charts
Verify vendorability
0s
Verify vendorability
Test e2e parallel
1h 16m
Test e2e parallel
Test e2e serial
23m 38s
Test e2e serial
Test e2e parallel (with alpha features)
1h 10m
Test e2e parallel (with alpha features)
Test e2e serial (with alpha features)
23m 8s
Test e2e serial (with alpha features)
All tests successfull
0s
All tests successfull
Promote artifacts
0s
Promote artifacts
Failure notifications
1s
Failure notifications
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Test e2e parallel (with alpha features)
Process completed with exit code 1.
Test e2e parallel
The hosted runner: GitHub Actions 5 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.

Artifacts

Produced during runtime
Name Size
e2e-artifacts-parallel-alpha.tar.lz4 Expired
38.8 MB
e2e-artifacts-serial-alpha.tar.lz4 Expired
7.87 MB
e2e-artifacts-serial.tar.lz4 Expired
7.95 MB
helm-charts.zip Expired
133 KB
operatorimage.tar.lz4 Expired
121 MB