Skip to content

Go

Go #5959

Triggered via schedule November 12, 2023 23:04
Status Failure
Total duration 1h 47m 33s
Artifacts 5

go.yaml

on: schedule
Verify vendorability
0s
Verify vendorability
Test e2e parallel
1h 1m
Test e2e parallel
Test e2e serial
23m 1s
Test e2e serial
Test e2e parallel (with alpha features)
1h 42m
Test e2e parallel (with alpha features)
Test e2e serial (with alpha features)
23m 49s
Test e2e serial (with alpha features)
All tests successfull
0s
All tests successfull
Promote artifacts
0s
Promote artifacts
Failure notifications
3s
Failure notifications
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Test e2e parallel
The hosted runner: GitHub Actions 2 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Test e2e parallel (with alpha features)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
e2e-artifacts-parallel-alpha.tar.lz4 Expired
44.2 MB
e2e-artifacts-serial-alpha.tar.lz4 Expired
8.01 MB
e2e-artifacts-serial.tar.lz4 Expired
7.82 MB
helm-charts.zip Expired
133 KB
operatorimage.tar.lz4 Expired
121 MB