Skip to content

Fix socket_import_stream() (#5167) #2829

Fix socket_import_stream() (#5167)

Fix socket_import_stream() (#5167) #2829

Triggered via push October 18, 2023 07:04
Status Failure
Total duration 6h 0m 26s
Artifacts

test-linux.yml

on: push
Matrix: test-linux
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test-linux (8.1)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
test-linux (8.1)
The operation was canceled.
test-linux (8.0)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
test-linux (8.0)
The operation was canceled.