Skip to content

chore(main): release bridge-ui 2.13.0 #2249

chore(main): release bridge-ui 2.13.0

chore(main): release bridge-ui 2.13.0 #2249

Triggered via pull request September 28, 2024 00:18
Status Failure
Total duration 1h 17m 54s
Artifacts

bridge-ui.yml

on: pull_request
deploy_bridge-ui_devnet_preview  /  build-deploy
11m 54s
deploy_bridge-ui_devnet_preview / build-deploy
deploy_bridge-ui_hekla_preview  /  build-deploy
31m 27s
deploy_bridge-ui_hekla_preview / build-deploy
deploy_bridge-ui_mainnet_preview  /  build-deploy
21m 37s
deploy_bridge-ui_mainnet_preview / build-deploy
deploy_bridge-ui_hekla_production  /  build-deploy
deploy_bridge-ui_hekla_production / build-deploy
deploy_bridge-ui_mainnet_production  /  build-deploy
deploy_bridge-ui_mainnet_production / build-deploy
Fit to window
Zoom out
Zoom in

Annotations

3 errors
deploy_bridge-ui_mainnet_preview / build-deploy
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
deploy_bridge-ui_mainnet_preview / build-deploy
The self-hosted runner: arc-runner-set-7vkwv-runner-sbnqf lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
deploy_bridge-ui_mainnet_preview / build-deploy
The operation was canceled.