Skip to content

Update from base builder #115

Update from base builder

Update from base builder #115

Triggered via push September 6, 2024 11:48
Status Failure
Total duration 2m 4s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (9.1)
Process completed with exit code 1.
build (9.4)
The job was canceled because "_9_1" failed.
build (9.4)
The operation was canceled.
build (9.2)
The job was canceled because "_9_1" failed.
build (9.2)
The operation was canceled.
build (10.0)
The job was canceled because "_9_1" failed.
build (10.0)
The operation was canceled.
build (9.3)
The job was canceled because "_9_1" failed.
build (9.3)
The operation was canceled.