Skip to content

Update from base vm #96

Update from base vm

Update from base vm #96

Triggered via push December 10, 2023 15:15
Status Failure
Total duration 21s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (9.0)
Process completed with exit code 2.
build (9.2)
Process completed with exit code 2.
build (9.1)
The job was canceled because "_9_2" failed.
build (9.1)
Process completed with exit code 2.
build (9.3)
The job was canceled because "_9_2" failed.
build (9.3)
The operation was canceled.