[feat] Overload lax
methods
#516
CI.yml
on: pull_request
Matrix: test_linux
Matrix: test_macos
Matrix: test_windows
Annotations
24 errors
test_windows (3.9)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_windows (3.9)
The operation was canceled.
|
test_windows (3.12)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_windows (3.12)
The operation was canceled.
|
test_windows (3.10)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_windows (3.10)
The operation was canceled.
|
test_windows (3.11)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_windows (3.11)
The operation was canceled.
|
test_macos (3.10)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_macos (3.10)
The operation was canceled.
|
test_macos (3.11)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_macos (3.11)
The operation was canceled.
|
test_linux (3.10)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_linux (3.10)
The operation was canceled.
|
test_linux (3.9)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_linux (3.9)
The operation was canceled.
|
test_linux (3.11)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_linux (3.11)
The operation was canceled.
|
test_macos (3.9)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_macos (3.9)
The operation was canceled.
|
test_linux (3.12)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_linux (3.12)
The operation was canceled.
|
test_macos (3.12)
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/58/merge' exists
|
test_macos (3.12)
The operation was canceled.
|