fix: regenerate pb2 files for compatibility with protobuf 5.x #87
Annotations
9 errors
unit (3.12)
Process completed with exit code 1.
|
unit (3.10)
The job was canceled because "_3_12" failed.
|
unit (3.10)
The operation was canceled.
|
unit (3.9)
The job was canceled because "_3_12" failed.
|
unit (3.9)
The operation was canceled.
|
unit (3.7)
The job was canceled because "_3_12" failed.
|
unit (3.7)
The operation was canceled.
|
unit (3.8)
The job was canceled because "_3_12" failed.
|
unit (3.8)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage-artifact-3.11
Expired
|
1.64 KB |
|