-
Notifications
You must be signed in to change notification settings - Fork 44
ODE Release Preparation
hmusavi edited this page Mar 14, 2019
·
9 revisions
During the course of development, source code changes are committed to Git
and pushed
to GitHub.
- All features are developed in a
feature branch
off ofdev
branch usually named after the Jira ticket ID. All commits must also carry the Jira ticket ID so that all commits for the feature can be traced and listed from Jira. When the feature is fully developed with adequate Unit Testing, documentation and regression testing, a Pull Request (PR) is created and assigned to reviewers for approval. Once the PR is approved, the developer who created the PR, will merge thefeature branch
todev
branch and close the PR. When all features belonging to a Release Backlog are merged todev
, it is time to go to Step 2. - Tester pulls from
dev
branch and builds the pre-release software - Tester runs the automated regression test scripts and verifies that all tests pass
- Tester verifies automated regression tests scripts by manually running a sampling of the manual tests provided here.
- Tester reports the test results to the project team. If any test has failed, the pre-release activities are aborted and process starts from the beginning (step 1) or approval from Product Owner (PO) must be requested to release the software with a known issue. If all tests have passed or PO has approved the release with a known issue, a developer or a tester performs the following Release Process.
- Tester pulls the software from the GitHub using the these instructions and runs the automated regression test scripts again.
- Tester verifies automated regression test scripts by manually running a sampling of the manual tests.
- Tester reports the test results to the project team. If any test has failed, the release activities are aborted and process starts from the beginning (step 1) or approval from Product Owner (PO) must be requested to release the software with a known issue. If all tests have passed or PO has approved the release with a known issue, the project team notifies the stakeholders that the ODE software release is ready for deployment.
- The ODE software user pulls the software from the GitHub using the these instructions, builds the executable (Docker Image), deploys it to their
Development (DEV)
environment and runs the automated regression test scripts, manual test procedures and/or their own suite of User Acceptance Testing. - If UAT testing is completed successfully and all tests PASS, the software can be deployed to
Production (PROD)
environment. If any test fails, the issue must be reported in ODE issue tracker and followed up by the ODE Support SOP.
When it's time to release the software to production, the following steps need to be taken by the ODE development team:
- Switch to
dev
branch which should contain the latest code to be released:
git checkout -B dev origin/dev
git pull --recurse-submodules=yes origin
- Release the software which will promote the version, tag the release, prepare for a new development iteration and merge the tagged release to
stage
branch.
. ./scripts/release.sh <releaseVersion>
where <releaseVersion>
is the version that we are releasing, for example 1.2.3
- Decode a file with asn1c
- Deposit BSM to S3
- Docker fix for SSL issues due to corporate network
- Docker management
- ECDSA Primer
- Filter BSMs through PPM module
- Geofence Filtering for PPM
- Import BSMs from RSU log file
- Import TIMs from RSU log file
- jpo security svcs Integration
- Link host directory to Docker directory
- Migrating from SDW websocket depositor to SDW Depositor Submodule
- ODE Release Deployment
- ODE Release Preparation
- Prepare a fresh Ubuntu instance for ODE installation
- Process for Handling Bugs (Code Defects)
- Run the ODE using the ASN codec module
- Query RSU for set TIMs
- Schema Version 6 Change Notice
- Signed Message File Import
- TIM REST Endpoint Changes
- Using the .env configuration file
- Using the ODE test harness
- Delete TIM on RSU test
- Event Logger Test
- Import Decode and Deliver BSM Test
- Manage SNMP Test
- Sending PDM to RSU Test
- Sending TIM to RSU Test
- Submit_TIM_To_SDW Test
- Log File Changes (schemaVersion=4)
- Receive BSMs over UDP
- Receive ISD via UDP and deposit to SDC
- Receive VSD via UDP and deposit to SDC
- Run the crypto test vectors code with ODE team's OSS encoder
- SchemaVersion 5 Change Notice